Skip Ribbon Commands
Skip to main content

Synthetic Grass Surfacing

:

Synthetic Grass Surfacing at 3 Sites CC24-0973-52-00-00

Agreement with FieldTurf USA for replacement of synthetic grass surfacing
at Balboa Elementary School, Loma Portal Elementary School, and
University City High School. Term: March 26, 2024 through project
completion. Board approved amount of $1,284,521.75 does not include
10% contingency.
​Board Award Doc: https://go.boarddocs.com
SGS @ 3 Sites        (CC24-0973-52)                                                           PSA Specialist Assigned to Project:
                                                                                                                                       Maria Cruz   mcruz5@sandi.net   cell: (619) 879-7870

Balboa Elementary School, 1844 S. 40th St., San Diego, CA 92113

Point Loma Elementary School, 3341 Browning St., San Diego, CA 92106                                            Bid Advertisement: 02/22/24

University City High School, 6949 Genesee Ave., San Diego, CA 92122                                                Board Award: 03/26/24   

  
  
  
  
collapse Document Types : Bid Documents ‎(1)
Synthetic Grass Surfacing at 3 Sites (CC24-0973-52-00-00)_Contract Info.pdf
  
4/8/2024 5:49 PMCruz Maria
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(5)
GC LOA - Synthetic Turf at 3 Sites CC24-0973.pdf
  
4/8/2024 5:31 PMCruz Maria
GC-FieldTurf PJF (rev).pdf
  
4/22/2024 3:42 PMCruz Maria
GC-FieldTurf PJF.pdf
  
4/8/2024 5:25 PMCruz Maria
National Construction Rentals LOA (Synth Grass at 3 Sites).pdf
  
4/22/2024 3:31 PMCruz Maria
National Construction Rentals SPJ (Synth Grass at 3 Sites).pdf
  
4/22/2024 3:31 PMCruz Maria